Inspection Schedule

Manage and view upcoming property inspections for Redoubt Capital projects.

Inspection Types:
Pre-Acquisition
Phase Inspection
Final Inspection
Re-Inspection

321 Pine Ct

Pre-Acquisition

321 Pine Ct, Charlotte, NC 28203 — Sedgefield

Date & Time

Feb 12, 2026 at 9:00 AM

Project Manager

Ryan McMahon

(704) 555-0101

Access

Lockbox code: 4521

Required Scope

Full property inspection: structural, foundation, roof, HVAC, electrical, plumbing, exterior, interior, and lot grading. Provide acquisition recommendation.

123 Main St

Phase — Drywall

123 Main St, Charlotte, NC 28202 — South End

Date & Time

Feb 18, 2026 at 10:00 AM

Project Manager

Ryan McMahon

(704) 555-0101

Access

Contractor on site (Bryan Sullivan)

Required Scope

Drywall phase inspection. Verify proper tape, mud, and finish quality. Check for nail pops, cracks, and seam issues. Confirm insulation coverage before drywall in any exposed areas.

123 Main St

Re-Inspection

123 Main St, Charlotte, NC 28202 — South End

Date & Time

Feb 20, 2026 at 2:00 PM

Project Manager

Ryan McMahon

(704) 555-0101

Access

Contractor on site (Bryan Sullivan)

Previous Findings (RPT-2026-005)

5 deficiencies found in electrical rough-in phase. Major: 2 circuits missing AFCI protection in bedrooms. Major: junction box access obstructed in attic. Verify all corrections have been made.

Required Scope

Re-inspect all 5 electrical deficiencies from RPT-2026-005. Confirm AFCI breakers installed, junction box access restored, and remaining 3 minor items corrected.

Kodiak Lane

Phase — Rough-In

512 Kodiak Ln, Charlotte, NC 28210 — Starmount

Date & Time

Feb 25, 2026 at 9:00 AM

Project Manager

Ryan McMahon

(704) 555-0101

Access

Contractor on site (Bryan Sullivan)

Required Scope

Rough-in phase inspection: plumbing (PEX manifold), electrical (200-amp panel, dedicated circuits), and HVAC ductwork for basement addition. Must pass before insulation/drywall.

789 Elm Dr

Final Inspection

789 Elm Dr, Charlotte, NC 28209 — Dilworth

Date & Time

Mar 5, 2026 at 10:00 AM

Project Manager

Ryan McMahon

(704) 555-0101

Access

Lockbox code: 7788

Required Scope

Full final inspection before listing. Verify all renovation work is complete and code-compliant. Check all systems, finishes, and exterior. Issue certificate of completion recommendation.

321 Pine Ct

Phase — Demo

321 Pine Ct, Charlotte, NC 28203 — Sedgefield

Date & Time

Mar 20, 2026 at 9:00 AM

Project Manager

Ryan McMahon

(704) 555-0101

Access

Contractor on site

Required Scope

Post-demo phase inspection. Verify structural integrity after demo, confirm load-bearing elements intact, and validate framing for planned renovation scope.